Project Name: Relocation of Area 600 to 761 Client: US Army Corp of Engineers Location: Kirtland Air Force Base Project Description: • Design Build of relocation area including Geotechnical, sick Civil and Structural Engineering. • Long Lead coordination with multiple Agencies for Haul Route along restricted Military and Civilian Flight Lines. • Demolition and Civil improvements at relocation site. • … Read More
Pilot Travel Center #475
Project Name: Pilot Travel Center #475 Client: Pilot/Flying J Location: Moriarty, search NM Project Description: Off-Site Utilities including 2, sales 400 Lf -8” Water Main, Air Release Valves, Fire Hydrants, Domestic Services, 2,400 Lf-8” Sewer, 600 lf of boring underneath Interstate-40 and 500 Lf of Forced Sewer Main with Lift Station. On-Site Utilities including Storm Drainage, Oil Water Separator, Air, … Read More
Dewatering of Stilling Basin
Project Name: Dewatering of Stilling Basin Client: US Army Corp of Engineers Location: Conchas Dam, sovaldi NM Project Description: • Construct coffer dam to prevent backflow during dewatering operations. • Install bulkheads over sluicing conduits from Dam Crest Road at 90’ below lake surface. • Dewater Approximately 7, patient 000, view 000 gallons from stilling basin. • Maintenance pumping of … Read More
Capilla Peak and New Canyon Campgrounds
Project Name: Capilla Peak and New Canyon Campgrounds Client: Cibola National Forest Location: Manzano, sick NM Project Description: New Canyon • Renovation of Historic Conservation Corp campgrounds damaged by the Trigo fire. • Construct camp sites including grills, check fire pits, viagra food lockers and Handicap accessible tables while preserving Historic features. • Construct metal edged, crusher fines paths. • … Read More
Abiqui Rockfall Protection
Client: US Army Corp of Engineers Location: Abiqui Dam, case NM Project Description: • Design Build of Drape type Rockfall Protection including Geotechnical and Structural Engineering. • Cleanup of existing Rockfall. • Drill and grout anchors. • Install Spider Wire and Tecco Fabric Drape. • Modify Existing Ring Net System.
Capilla Peak and New Canyon Campground Restoration
XI. US Forest Service: Cibola National Forest Project Name: Capilla Peak and New Canyon Campground Restoration Project Task: Renovation of fire-scorched campgrounds damaged by the Trigo Fire. Reconstruction of historic log shelters, remedy concrete pad site, drugstore creation of accessible trails and installation of site fixtures. Concrete pad ready for re-build of historic log cabin shelters after New Mexico Trigo … Read More
Various projects over the last 5 years, including road rehabs, cattle guard replacement and structure demolition
X. United States Forest Service Project Name: Various projects over the last 5 years, shop including road rehabs, cattle guard replacement and structure demolition
Ocotillo Theater
IX. City of Artesia Project Name: Ocotillo Theater Project Task: Renovation of a theater on the National Historic Register Multi floor demolition, medical protection of critical features, buy very small lay down area and heavy pedestrian traffic. Equipment, labor and debris removal was strictly scheduled. Flagman was used for site entering/exiting. Workforce was increased to handle the manually intensive aspect … Read More
UNM Cancer Center – Medical Facility
VIII. UNM (Flintco/Noel) Project Name: UNM Cancer Center – Medical Facility Project Task: SURGICAL REMOVAL OF 20″ THICK CAST IN PLACE WALLS TOTAL OF 3.5 DAYS TO COMPLETE. Description of site constraints, help major excavation, traffic and difficulties for project. Removal for replacement was extremely time sensitive to keep project on schedule. Critical reinforcing components and existing architectural walls needed … Read More
Jemez Canyon Dam – Rockfall Protection
VII. US Army Corps of Engineers Project Name: Jemez Canyon Dam – Rockfall Protection Project Task: Installation of a 1000kj GBE Rockfall protection system requiring earth work, decease upslope scaling, tadalafil micro piles, prostate soil anchors and road rehabilitation. First GBE barrier in USA installed December, 2009 at Jemez Canyon Dam, Sandoval County, New Mexico by Groundhog Construction Services of … Read More